Glen Engineering Team is proud to share the successful execution of installation, commissioning, and Site Acceptance Testing (SAT) for the IntMoor Systems project at a chemical terminal in Poland.
Our scope included the deployment and testing of:
▪️ Quick Release Hooks (QRH) with remote release and load monitoring
▪️ Berthing Approach System (BAS)
▪️ Central Monitoring System (CMS)
Through this integrated solution, we helped our client:
✔️ Enhance operational safety with reliable emergency release capabilities
✔️ Improve berthing efficiency through real-time vessel monitoring
✔️ Enable smarter decision-making with centralized data visibility
In addition, our team provided on-site training to the local maintenance team, ensuring smooth handover and long-term operational readiness.
This project highlights Glen Engineering Team’s strong project delivery capability and our commitment to reliable full lifecycle support.
#GlenEngineering #MooringSystems #QRH #PortEngineering #Commissioning #SAT #Automation #MarineEngineering



