Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

GLEN Capability for Mooring Bollard

32 pcs T-head bollards were completed by GLEN. It is high standard  product requested by client. But we successfully delivered these bollards in time through our efforts by following procedures:

 

 

Design – Finite Element Analysis – Manufacture – Load test under the third party – Surface Treatment – Coating – Inspection – Delivery

 

Hope GLEN’s product can bring safe to the port operation.

 

#mooring #bollard #FEA

Latest Project/News

Manufacture

1 Minute to Know GLEN QRH Machining

  GLEN quick release hook main parts, such as hooks and side plates, are machined by CNC, ensuring precision, durability, and consistency in every component. Our commitment to … Read More

No more posts to show

Fender

Quick Release Hook

Project Management

Integrated Control and Monitoring

Copyright © 2023 GLEN MARITIME (Chongqing) ENGINEERING TECHNOLOGY LIMITED | Privacy Policy | Terms & Conditions

info@glenengineering.com

     Follow Us