Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

GLEN Client-Witnessed FAT Completed to Ensure Reliable Capstan Performance

We were pleased to welcome our client representatives to Glen’s manufacturing facility for the Factory Acceptance Test (FAT) of four Free-Standing Capstans.

The FAT process covered functional testing, control system checks, and safety interlock validation, and proof load testing, ensuring full compliance with project specifications and applicable marine standards.

Witnessed testing and transparent inspection process are the essential part of our commitment to quality assurance, operational reliability, and engineering certainty —before these equipments are shipped and installed on site.

Very appreciate our client’s trust and close collaboration throughout the inspection process.

Fender

Quick Release Hook

Project Management

Integrated Control and Monitoring

Copyright © 2023 GLEN MARITIME (Chongqing) ENGINEERING TECHNOLOGY LIMITED | Privacy Policy | Terms & Conditions

info@glenengineering.com

     Follow Us