Glen recently completed the high-quality delivery of six units of 125T Quick Release Hooks for a deepwater oil tanker terminal owner’s mooring system replacement project.
For this project, our engineering team worked closely with the client to deliver customized design adaptations—enabling the berth to safely accommodate larger vessels and changes in mooring line directions, without increasing the owner’s overall project cost.
In addition to capacity and performance, our engineering team also focused on operability, durability, and lifecycle efficiency:
- Fully detachable designfor easier and safer maintenance operations
- Stainless steel protectionat hook impact areas to minimize coating damage
- Upgraded 316L stainless steel nuts and washerswith spark-prevention design
- Clear operation and maintenance menusintegrated into the electrical control cabinet
This project reflects Glen’s commitment to engineering-driven system optimization — delivering enhanced performance, safer operation, and long-term value through considerate detail design.



