Quick release hook is service under a marine environment for different types of ports and jetties. It requires high anticorrosion requirements for coating. GLEN does the strict surface ... Read More
We have just completed 110 pcs mooring bollards with standard anticorrosion coating. Our coating system is according to ISO12944 C5-M, designed to prevent corrosion in carbon or low-alloy structural steel and ... Read More
Based on clients’ requirements and project progress, we can deliver the supplied products in batches. For the marine engineering project, the product anchor bolts need to be pre-embedded ... Read More
We recently had the pleasure of hosting a client at our factory for an inspection visit and function test of our Integrated Capstan product. The integrated capstan will ... Read More
After a few years of normal use, our client requested that we provide free on-site maintenance service for 29 sets of quick release hooks, as per the contract. ... Read More
The unit element fender system for european project has completed its performance test and inspection, and is now ready for delivery! GLEN ensures that this fender ... Read More
We were thrilled to welcome a valued client to our rubber fender factory last month! During the visit, our client had the opportunity to witness firsthand the state-of-the-art ... Read More
The class-certified 250Ton FSO hook is running well for the vessel of FSO Success Challenger XXXVII in Indonesia. In order to ensure reliable product quality, GLEN hook ... Read More
After the Chinese New Year, 20 pcs of cone fender were just completed and celebrate the Rabbit Year for the clients. Under GLEN’s quality control system, reliable marine ... Read More
A special non-standard fender is required by our long-term partner. In order to satisfy the emergency demand of client’s project under a short delivery time, we customized a ... Read More
106 pcs of cleat bollard were completed and delivered to UAE. These cleat bollards passed NDT according to GLEN standard welding procedure specifications. Only primer is required for ... Read More
After 60 days of hard work, 72 sets of T-head bollards have been inspected and delivered overseas. Bollard design, drawing review, casting, grinding, sandblasting, painting, and packing, all ... Read More